Report Abuse Product :Railway Equipment

Railway Equipment

Railway Equipment

Railway Equipment

Nik Ceram Razi corporation

Category :

Published at:

2017-11-21

Products displays in other languages :

Request for Final Price

Discuss about the product

Sign in to submit your request

Sign in to submit your request

One of the strategic locations in the railway and metro industry is when the train is to change the line or the direction. Due to the high friction, these places cause heavy wear on the rails and gets them out of standard. The best way to do this is to fabricate a piece with high abrasion resistance. The piece which is known as the central piece is imported from France. Due to complexity in its technical knowledge, the other countries have not taken steps towards its production. But with the perseverance and spending time on it, the company succeeded in acquiring technical knowledge of the reverse engineering of the original piece. The obvious feature of this piece is that, with increasing friction and axial load, the piece is not only not rubbed, but its abrasion resistance rises. Another feature is its high flexibility, which results in its high tolerance to the shocks caused by the train. Reaching the technical knowledge of this piece has provided the ground for manufacturing this central piece in any models and dimensions. 

Company Name

Nik Ceram Razi corporation

Manager

Knowledge-based

Is

Registration number

view info Sign in or sign up.

Phone Number

view info Sign in or sign up.

Fax

view info Sign in or sign up.

Address

view info Sign in or sign up.

Website

view info Sign in or sign up.

Email

view info Sign in or sign up.

User name

Technical Engineering Company Nik Ceram Razi

Email

view info Sign in or sign up.

Mobile

view info Sign in or sign up.

Membership Service

VIP

Membership Duration

1 year ago

2017-07-09 18:52:32

Brand

Nikceram razi

Model

Railway Crossing Central Piece (R50 & R190)

Supply Ability

10000 Meter in Year

Minimum order quantity

10 Meter

Delivery Term

DAF, EXW

Payment Term

Cash, TT, LC

Last time edited

2018-09-15

Published at

2017-11-21